Marinas
Shenzhen — Marina floating docks
96 new berths on an existing concrete quay, launched and connected in three phases without closing the marina.
- Location
- Shenzhen, Guangdong
- Scope
- Heavyweight concrete floats + aluminium gangways
Projects
Locations, sizes and scope are grouped by project type, so you can judge which structure is closest to your site.
Marinas
96 new berths on an existing concrete quay, launched and connected in three phases without closing the marina.
Floating bridges
Low freeboard limits obstruction of the water surface; floats and short piles share the mooring duty across seasonal levels.
Marinas
Heavyweight concrete modules with power, water and evacuation provisions for high-density berthing during regattas.
Floating bridges
Annual water-level range above 8 m; the deck rises and falls with the reservoir while keeping the traditional covered-bridge form.
Waterfront structures
Trussed steel structure with timber-look decking, relocatable as a whole to change position and orientation.
Marinas
Modular design that can be detached as a whole ahead of typhoon season, cutting inspection and insurance costs.
Waterfront structures
Pile-free floating solution with anchor blocks inside a reef protection zone, leaving the seabed undisturbed during works.
Floating bridges
Assembled and removed in three days; the float system has been reused across several seasons.
No published projects in this category yet.
Talk to us
Send water depth, water-level range, vessel types and usage, and we will come back within three business days with a concept and an indicative budget.